EXECUTIVE SUMMARY:
- Transport for London (TfL) needed to install a combined Energy Management (EMS) and Power Quality Management System (PQMS) to replace their basic monitoring system and provide detailed information and reports to their infrastructure team
- A key consideration was TfL’s requirement to monitor the complete power consumption of the building, as well as existing equipment on site, all viewed in one head-end software package both local and remote
- E-TEC Power Management, a principal Janitza Solution Partner, was engaged to expand and deliver the EMS and PQMS systems


